Liulin-MO first data
Submitted by admin on Wed, 2016-04-06 00:00
Liulin-MO first data Available Liulin-MO data during the TGO cruise: 06.04.2016 – first turned on during NECP:
- Checked nominal side with nominal power unit & nominal side with redundant power unit.
- The dosimeter demonstrated to be in good health and performs valid physical measurements.
- From 22.04 to 18.07 one of the 3He and the scintillate detectors of FREND, as well as Liulin-MO were turned on almost continuously.
- From 19.07 to 11.08 during Deep Space Maneuvers of TGO FREND and Liulin-MO were turned off.
- Since 12.08.2016-currently Liulin-MO is turned on.
- During that time the dosimeter has measured the dosimetric parameters of GCR.
Dose rates recorded in the perpendicular detectors B(A) and D(C) of Liulin-MO and the Oulu Neutron Monitor cosmic ray count rate (https://cosmicrays.oulu.fi/) for the period 22.04-18.07. 2016